News / Recent Awards

  • Columbia University - Manhattanville Campus
    • Two (2) B&W Model FM 10-57 Package Boilers
    • Two (2) Hamworthy-Peabody Combustion ECOjet Ultra Low NOx Burners
    • Two (2) PLC based Burner Management and Boiler Control Systems for new B&W Boilers
    • Start-up, testing and training
  • New York University - Langone Medical Center
    • Two (2) B&W Model FM-103-97 Package Boilers
    • Two (2) Todd Combustion Variflame Low NOx Burner
    • Two (2) Applied Heat Recovery Economizers
    • Two (2) Allen-Bradley PLC based Burner Management and Boiler Control Systems for new B&W Boilers
    • Contract management, start=up, testing and training
  • Bristol-Myers Squibb - Lawrenceville, NJ Campus
    • One (1) B&W Model 120-79 WH Heat Recovery Steam Generator
    • One (1) Hamworthy-Peabody Combustion Model ECOgen Low NOx Duct Burner
    • One (1) Preferred Utilities SCR Control System
    • One (1) Preferred Utilities Burner Management and HRSG Control System
    • Start-up, testing and training
  • Inolex Corporation
    • One (1) B&W Model FM 9-57 Package Boiler
    • One (1) Preferred Utilities Model Xplus Low NOx Burner
    • One (1) Preferred Utilities Burner Management and Boiler Control System
    • Start-up, testing and training
  • Rutgers University - Newark Campus
    • Three (3) Hamworthy-Peabody Combustion Model ECOjet Ultra Low NOx Burners
    • Combustion control logic for implementation on PLC based control systems
    • Project management and coordination of burner and controls installation
  • PolyOne Corporation
    • One (1) Hamworthy-Peabody Combustion Model ECOjet Ultra Low NOx Burner
    • One (1) Preferred Utilities Burner Management and Boiler Control System
    • Installation of Hamworthy-Peabody Combustion burner and Preferred control system
    • Start-up, testing and training
    • Ongoing service and maintenance
  • Trenton Psychiatric Hospital
    • Three (3) Hamworthy-Peabody Combustion Model MSC2 Low NOx Burners
    • Three (3) Preferred Utilities Boiler Control Systems with SCADA
    • Plant Master Control Panel including Deaerator and condensate controls
    • Turnkey installation of boiler controls equipment
    • Start-up, testing and training
  • Celgene Corporation
    • One (1) Stickle Steam Model 200-2.5 IVSH Deaerator
    • One (1) Preferred Utilities Deaerator Control System
    • Start-up, testing and training
  • University of Oregon
    • One (1) B&W Model FM-103-79 Package Boiler
    • One (1) Hamworthy-Peabody Combustion Model ECOjet Ultra Low NOx Burner
    • One (1) E-Tech Economizer
    • One (1) Preferred Utilities PLC based Burner Management and Boiler Control System for new B&W Boiler
    • One (1) Preferred Utilities PLC based Burner Management and Boiler Control System for existing boiler
    • Removal of superheater in existing Nebraska Boiler to convert unit to saturated type boiler
    • Turnkey installation of boiler controls on existing Nebraska boiler
    • Contract management, start-up, testing and training
Tel:
908-938-3563
Fax:
908 - 269 - 8064
General information:
info@processcontrols.com
Sales & Service:
bob@processcontrols.com