News / Recent Awards
- Columbia University - Manhattanville Campus
- Two (2) B&W Model FM 10-57 Package Boilers
- Two (2) Hamworthy-Peabody Combustion ECOjet Ultra Low NOx Burners
- Two (2) PLC based Burner Management and Boiler Control Systems for new B&W Boilers
- Start-up, testing and training
- New York University - Langone Medical Center
- Two (2) B&W Model FM-103-97 Package Boilers
- Two (2) Todd Combustion Variflame Low NOx Burner
- Two (2) Applied Heat Recovery Economizers
- Two (2) Allen-Bradley PLC based Burner Management and Boiler Control Systems for new B&W Boilers
- Contract management, start=up, testing and training
- Bristol-Myers Squibb - Lawrenceville, NJ Campus
- One (1) B&W Model 120-79 WH Heat Recovery Steam Generator
- One (1) Hamworthy-Peabody Combustion Model ECOgen Low NOx Duct Burner
- One (1) Preferred Utilities SCR Control System
- One (1) Preferred Utilities Burner Management and HRSG Control System
- Start-up, testing and training
- Inolex Corporation
- One (1) B&W Model FM 9-57 Package Boiler
- One (1) Preferred Utilities Model Xplus Low NOx Burner
- One (1) Preferred Utilities Burner Management and Boiler Control System
- Start-up, testing and training
- Rutgers University - Newark Campus
- Three (3) Hamworthy-Peabody Combustion Model ECOjet Ultra Low NOx Burners
- Combustion control logic for implementation on PLC based control systems
- Project management and coordination of burner and controls installation
- PolyOne Corporation
- One (1) Hamworthy-Peabody Combustion Model ECOjet Ultra Low NOx Burner
- One (1) Preferred Utilities Burner Management and Boiler Control System
- Installation of Hamworthy-Peabody Combustion burner and Preferred control system
- Start-up, testing and training
- Ongoing service and maintenance
- Trenton Psychiatric Hospital
- Three (3) Hamworthy-Peabody Combustion Model MSC2 Low NOx Burners
- Three (3) Preferred Utilities Boiler Control Systems with SCADA
- Plant Master Control Panel including Deaerator and condensate controls
- Turnkey installation of boiler controls equipment
- Start-up, testing and training
- Celgene Corporation
- One (1) Stickle Steam Model 200-2.5 IVSH Deaerator
- One (1) Preferred Utilities Deaerator Control System
- Start-up, testing and training
- University of Oregon
- One (1) B&W Model FM-103-79 Package Boiler
- One (1) Hamworthy-Peabody Combustion Model ECOjet Ultra Low NOx Burner
- One (1) E-Tech Economizer
- One (1) Preferred Utilities PLC based Burner Management and Boiler Control System for new B&W Boiler
- One (1) Preferred Utilities PLC based Burner Management and Boiler Control System for existing boiler
- Removal of superheater in existing Nebraska Boiler to convert unit to saturated type boiler
- Turnkey installation of boiler controls on existing Nebraska boiler
- Contract management, start-up, testing and training